Asphalt Paving Level 2

Objective:

To assure that personnel responsible for inspecting asphalt pavement construction (paving and compaction) are familiar with FDOT specification requirements, good construction practices and equipment operation necessary to place and compact a Superpave mixture which will meet requirements for smoothness, texture, density, cross slope and thickness.

Course Content:

  • Project Administration
  • Surface Preparation
  • HMA Delivery
  • HMA Placement
  • HMA Compaction
  • Balancing Production Rates
  • Field Testing and Inspection

 Target Audience:

FDOT and contractor quality control personnel, quality control managers, roadway technicians, equipment operators, and paving supervisors

Class Duration:

Three days. Trainees registered will attend two days of classroom sessions and will take the examinations on the third day.

Exam Requirements:

A multiple choice, written exam is required.

Credit Hours

17 Professional Development Hours (PDHs)